Service

Concreting

In short

We pour new concrete as well as resurface it: driveways, house and shed slabs, paths, patios and hardstands, formed and reinforced by the same crew that lays the decorative finish. Residential driveways are commonly 100 mm with mesh, thicker where trailers or trucks are involved. Foot traffic at 24–48 hours, vehicles at seven days.

Detail

Concreting in South East Queensland

When there is nothing to resurface, we pour the slab too — formed, reinforced and finished by the same crew that lays the decorative work.

Plenty of jobs start as a resurfacing enquiry and turn out to need new concrete: a driveway that was never thick enough, a shed slab that was poured on fill, an extension that has no slab at all. Rather than hand you to a third party, we form, reinforce, pour and finish it ourselves.

That means the same crew sets the falls, the same crew nominates the mix, and the same crew comes back to lay the decorative finish once the slab has cured. Nobody blames the last trade for the crack.

We pour to the reinforcement and thickness the job actually needs — residential driveways at 100 mm with mesh as standard, thicker with heavier reinforcement where trucks, trailers or caravans are part of the picture. Control joints are cut where the slab wants to crack, not where they look tidiest.

  • Driveways, house slabs, shed slabs, paths, patios and hardstands
  • Formwork, reinforcement, pour, screed and finish in one contract
  • Falls set to move water away from buildings and pools
  • Saw-cut control joints, positioned to the slab, not the eye
  • Plain, broomed or decorative finish off the same pour
Concreting — recent job in South East Queensland
Recent work

Photographed on our own jobs.

Every photo on this site is a slab we prepared and finished ourselves. No stock library, no supplier brochures.

Method

Four days, in the same order, every job.

Preparation is most of the work and all of the warranty. The decorative part is the last day.

01 — Grind and test

Diamond grind back to sound concrete, then moisture and bond test. If the slab fails, you get told before you pay for an overlay that will lift.

02 — Repair and prime

Cracks cut, filled and bridged. Falls corrected so water leaves the slab instead of sitting on it. Primer coat the same day.

03 — Lay the finish

Overlay, stencil, aggregate or flake, laid to the build-up quoted. One crew, no subcontracted finishers.

04 — Seal and cure

Two coats of UV-stable sealer. Foot traffic at 24 hours, vehicles at 72 on most finishes.

Questions

The questions we get asked

Do you pour and then resurface?

Sometimes. A new slab needs to cure before it takes an overlay — usually 28 days. If you want a decorative finish immediately, we lay it in the pour instead.

How long until we can drive on new concrete?

Foot traffic at 24–48 hours, vehicles at 7 days for a standard residential pour. Heavier vehicles wait longer.

Which suburbs do you cover?

Brisbane, Ipswich, Logan, Redlands, the western corridor and both coasts. Anything further out we quote case by case.

Are you licensed?

QBCC licence 1109935, and fully insured. The licence number is on every quote and can be checked on the QBCC register.

Free measure and quote

Send a photo of the slab.

We will tell you whether it can be resurfaced, what finish suits it, and what it costs — before anyone turns up with a grinder.